Solar-Ready Home Electrical Checklist

The 10-point inspection we run on every Mackay home before solar, battery or EV installation.

TL;DR

  • Ten specific checks covering switchboard, earthing, cable path, RCDs, SPD and Ergon.
  • If your home fails any item we fix it in the same visit where possible.
  • Addressing issues upfront prevents delays and avoids "surprise" post-install costs.

The 10-point pre-solar electrical checklist

1. Switchboard age & condition

Is the board post-2010? Metal enclosure? RCBOs on each circuit? If not, upgrade is likely required. See switchboard upgrades.

2. Spare breaker capacity

Need 1-2 free slots for solar isolator + inverter breaker. More if adding battery or EV.

3. Main breaker rating

Ideally 63 A single-phase or higher for solar > 6.6 kW. Three-phase homes: 40 A per phase minimum.

4. MEN (earthing) system

Modern MEN link present, earth stake in good condition, no corroded or loose connections. Critical for solar anti-islanding.

5. RCD protection

All final sub-circuits protected per AS/NZS 3000:2018. Solar circuit requires dedicated RCD Type A or B.

6. Smart meter status

Does your home have a Type 4 interval smart meter? If not, Ergon will replace the existing meter 1-4 weeks after solar install. We notify Ergon automatically.

7. Cable path from roof to switchboard

Unobstructed route for DC cables from inverter to switchboard. Cavity access or conduit. Ceiling space should be passable and clean.

8. Surge Protection Device (SPD)

Mackay has high lightning activity. A Type 2 SPD at the main switchboard protects the whole home, including solar inverter. Highly recommended.

9. Inverter location

Shaded, ventilated, close to switchboard ideally. Not direct sun (shortens life) and not in unventilated cupboards.

10. Ergon connection details

NMI number, meter reference, current tariff, three-phase vs single-phase supply, and any existing export limits. We pull all of this from Ergon as part of the job.

What a "fail" costs to fix

IssueFix costImpact if skipped
Old ceramic-fuse board$1,800-$3,000Install cancelled by inspector
No spare breaker slots$200-$600Additional sub-board needed
Inadequate earthing$150-$400Inverter faults, safety hazard
No RCD protection$250-$800Non-compliant install
No SPD$300-$500Lightning risk to inverter

Why we insist on the walk-through

A 20-minute pre-install inspection avoids nasty surprises on install day. Every quote we issue in Mackay includes this inspection — it protects you from change-orders and protects us from unsafe work.

FAQs

How long does the pre-inspection take?

Typically 20-40 minutes. Free as part of any quote we provide.

Can I fix these items myself?

No — all work on the consumer mains and switchboard requires a licensed electrician in QLD.

Free pre-solar inspection

Book a 30-minute Mackay-area inspection. No obligation, full written report.

Book inspection