COMMERCIAL ELECTRICAL

Commercial electrical, up to 500 A

Three-phase upgrades, switchboards, EV chargers and meter changes. RPEQ-engineered, AS/NZS tested.

5.0 · 7 Google reviews

Request a 48-hour fixed-quote

TURNAROUND

48 hr quote

Three-scenario quote PDF within 48 hours.

48-hour fixed-quote turnaround for Mackay businesses.

30 to 500 kW Commercial systems we deliver
48 hr Fixed-quote turnaround
Mackay-owned Crew employed locally, no subcontractors
1 to 3 years Workmanship warranty per project

Brands and systems we work with

GoodWe
Deye
Jinko
Tesla
Fronius
Schneider Electric

How we work

From scope call to Certificate of Electrical Safety, a five-stage path

  1. Scope call

    Week 0. 30 minutes. We cover the upgrade scope, existing service size, switchboard age, target capacity, EV charger needs and whether RPEQ engineering applies.

  2. Site survey

    Week 1. Brad inspects on site: switchboard condition, cable size and route, earthing, available space, fault-current expectations. Photos and a survey sheet stay on file.

  3. Design and fixed quote

    Week 2. Drawings, materials list and RPEQ sign-off when service exceeds 100 A. Fixed-price quote, no variations unless scope changes in writing.

  4. Ergon and meter paperwork

    Week 3 to 5. We lodge the after-meter and metering forms with Ergon for service-size changes, new meter points or EV-charger sub-circuits. Lead time managed before the crew mobilises.

  5. Install, energise and CoES

    Week 5 to 6. Switchboard built off-site where possible. On-site cable pull, terminations and energising in agreed windows. Insulation, earth fault loop and polarity tests, Certificate of Electrical Safety lodged, handover folder with as-built drawings and RPEQ docs.

Sectors we serve

Industries we cover across Mackay and the Bowen Basin

Solar and electrical work for regional QLD operators, fitted around your shutdown windows and budget cycles.

Agribusiness and irrigation

14 sites since 2022

Sugar mills, irrigation pumps and cane farm sheds. Daytime grid draw cut by 60 to 75 percent on average.

Mining and resources

9 sites since 2022

Workshops, admin buildings and accommodation villages on Bowen Basin contracts.

Logistics and cold storage

7 sites since 2022

Cold rooms, freight depots and refrigerated transport hubs. Battery-backed for nightly load shedding.

Light industrial and workshops

11 sites since 2022

Fabrication shops, mechanic bays and trade premises with high daytime load profiles.

Where the work happens

Project counts by service and industry

Mackay-region sites Brad and the crew have delivered.

Service Sugar and agribusinessMining and resourcesHospitality and tourismTrades and logistics
Commercial solar4324
Battery and microgrid1112
Three-phase upgrades2213
EV charging infrastructure21

Project counts reflect work delivered by Brad and the Mackay crew.

Service areas

Mackay-local service hub, with project crews across the Whitsundays and Bowen Basin.

Recent commercial work, by the numbers

Mackay-region projects delivered in the last 18 months. References available on request.

1.2 MW

Installed since 2022

48 h

Quote turnaround

37

Sites commissioned

0

Hand-back surprises

Procurement

Safety record matters when you sign a contract

Mid-tier QLD operators ask for these numbers before they sign. Here they are.

0

LTI in last 24 months

100%

Crew SWMS-compliant

$20M

Public liability cover

Class A

QLD electrical licence

Audit packs available on request: SWMS, JSA, insurance certs and electrical contractor licence (Class A QLD).

Request compliance pack
  • Public Liability: $20M cover across every site
  • Working at Heights: All field crew certified
  • White Card: Required for any construction site work

Frequently asked questions

About commercial electrical.

For solar over 5 kW per phase or any EV charger over 7 kW, yes. Single-phase services are limited to 5 kW solar inverters under Ergon's connection rules. Three-phase also lets you spread load and run higher-capacity equipment without tripping. We assess the existing service before quoting.

Any commercial service over 100 A, any work that materially changes fault-current at the switchboard, and most multi-tenant or industrial installs in QLD require an RPEQ (Registered Professional Engineer Queensland) drawing set. We bring an RPEQ partner in on day one of design, included in the quote, no surprise fee at the end.

CoES is the QLD-required certificate confirming the work meets AS/NZS 3000 and was tested. It must be lodged with the network within 30 days of energising. We lodge it for you and hand you a digital copy with the as-built drawings at project handover.

Yes, for any commercial site. Switchboard cutover and final energising happen in the agreed window (typically Sunday morning or after-hours). The cable pull and pre-wire happen during normal hours with no impact on power.

Site survey + design: 1 week. Ergon paperwork (service-size change): 4 to 6 weeks lead time. On-site install + meter swap: 1 to 2 days. Total roughly 6 to 8 weeks from kick-off to energised.

Yes. $20M Public Liability across every site, current certificate available on request. We also carry Working at Heights and Confined Space tickets for any work above 2 m or inside switch rooms.

Class A (Queensland Electrical Contractor) lets us run the business, contract with you, and supervise apprentices. Class B is for sole operators only. We hold Class A, which is what commercial procurement teams will ask to see.

Call now