COMMERCIAL SOLAR

Commercial solar Mackay, 30 kW to 500 kW

Fed by AEMO interval data, three-scenario PDF in 48 hours, zero shutdown on install.

5.0 · 7 Google reviews

Request a 48-hour fixed-quote

TURNAROUND

48 hr quote

Three-scenario quote PDF within 48 hours.

48-hour fixed-quote turnaround for Mackay businesses.

30 to 500 kW Commercial systems we deliver
48 hr Fixed-quote turnaround
Mackay-owned Crew employed locally, no subcontractors
1 to 3 years Workmanship warranty per project

Brands and systems we work with

GoodWe
Deye
Jinko
Tesla
Fronius
Schneider Electric

How we work

From discovery call to handover, a six-stage path

  1. Discovery call

    Week 0. 30 minutes. We cover load profile, roof type, grid-connect feasibility.

  2. Data analysis

    Week 1 to 2. You hand over 12 months of interval data. We model three scenarios with payback and IRR.

  3. Site assessment and quote

    Week 2. 48-hour PDF delivery. Hardware, NPV, sensitivity analysis, finance options.

  4. Sign and engineer

    Week 3 to 6. Final design, Ergon lodgement, procurement. Deposit 20%, progress payments against milestones.

  5. Install and commission

    Week 7 to 9. On site 5 to 14 days depending on size. Zero shutdown of core operations.

  6. Handover and monitor

    Week 10. Monitoring live, O&M schedule set. First quarterly performance report lands at week 14.

Sectors we serve

Industries we cover across Mackay and the Bowen Basin

Solar and electrical work for regional QLD operators, fitted around your shutdown windows and budget cycles.

Agribusiness and irrigation

14 sites since 2022

Sugar mills, irrigation pumps and cane farm sheds. Daytime grid draw cut by 60 to 75 percent on average.

Mining and resources

9 sites since 2022

Workshops, admin buildings and accommodation villages on Bowen Basin contracts.

Logistics and cold storage

7 sites since 2022

Cold rooms, freight depots and refrigerated transport hubs. Battery-backed for nightly load shedding.

Light industrial and workshops

11 sites since 2022

Fabrication shops, mechanic bays and trade premises with high daytime load profiles.

Where the work happens

Project counts by service and industry

Mackay-region sites Brad and the crew have delivered.

Service Sugar and agribusinessMining and resourcesHospitality and tourismTrades and logistics
Commercial solar4324
Battery and microgrid1112
Three-phase upgrades2213
EV charging infrastructure21

Project counts reflect work delivered by Brad and the Mackay crew.

Service areas

Mackay-local service hub, with project crews across the Whitsundays and Bowen Basin.

Recent commercial work, by the numbers

Mackay-region projects delivered in the last 18 months. References available on request.

1.2 MW

Installed since 2022

48 h

Quote turnaround

37

Sites commissioned

0

Hand-back surprises

Lolee's Couriers, Mackay

Couriers and logistics

Lolee's Couriers, Mackay

Scope
28 kW
Duration
4 weeks

Depot daytime load covered from the roof; courier fleet charges off solar during the 11 to 3 window.

Visit Lolee's Couriers

Procurement

Safety record matters when you sign a contract

Mid-tier QLD operators ask for these numbers before they sign. Here they are.

0

LTI in last 24 months

100%

Crew SWMS-compliant

$20M

Public liability cover

Class A

QLD electrical licence

Audit packs available on request: SWMS, JSA, insurance certs and electrical contractor licence (Class A QLD).

Request compliance pack
  • Public Liability: $20M cover across every site
  • Working at Heights: All field crew certified
  • White Card: Required for any construction site work

Frequently asked questions

About commercial solar.

Typical 100 kW commercial system on Ergon Large Business tariffs pays back in 3.8 to 5.2 years, depending on your daytime load profile. We model three scenarios (conservative / base / aggressive) against 12 months of your actual interval data so you see the range, not a single rosy number.

Yes. Any commercial system over 30 kW is treated as embedded generation and requires a formal connection application with Ergon Energy. Approval typically takes 30 to 60 business days. We lodge the application on day one of design so the network approval runs in parallel with procurement, not after.

For 2025-26 the temporary $20,000 instant asset write-off applies to small business (under $10M turnover). Most commercial solar projects exceed that threshold and depreciate over the asset life. Talk to your accountant about the small business energy incentive (bonus 20% deduction for energy-efficient assets), which often applies.

No, in 99% of cases. The DC roof work happens with no impact on your power. The final cutover to live (the changeover at the switchboard) takes 30 to 60 minutes; we schedule it for a Sunday or after-hours window so trading is not interrupted.

STCs (small-scale technology certificates) apply to systems under 100 kW and are claimed once upfront, discounting your install cost. LGCs (large-scale generation certificates) apply to systems over 100 kW and are earned over 15 years per MWh generated. We model both pathways and recommend the better option for your system size.

We send Brad on site to inspect the roof structure, purlin spacing and material before quoting hardware. If your roof needs strengthening or replacement first, we tell you upfront. We won't quote a system that compromises the building.

Yes. PPA (you pay only for the kWh generated, no upfront cost) is available for commercial systems over 100 kW with our finance partners. We also offer chattel mortgage and operating lease for capex-friendly structures. The 48-hour quote PDF shows all three options.

Call now